Nexa Resources S.A.'s Aripuanã mine recorded zinc production of 13,000 tons in the third quarter of 2026, matching the record output posted in the first quarter of the same year, according to an analysis by Zacks Investment Research published on Yahoo Finance. The third-quarter figure represents a 48% sequential increase from the 8,800 tons produced in the second quarter. The company attributed the performance to higher throughput and better grades.
The recently installed fourth filter handled 61% of total tailings output in the third quarter. Consolidated plant utilization averaged 84% in the quarter, up from 71% in the second quarter, and reached 90% in the most recent month cited by the company. Nexa expects higher utilization and improved recoveries in the fourth quarter.
It is also accelerating mine development at Aripuanã to open additional mining fronts and support higher throughput in 2027. The source describes Aripuanã as a long-life, tier-one asset. The mine began its ramp-up and achieved first commercial sale in July 2022, reaching full operational status in July 2024.
Installation of the fourth filter, which began in the second half of 2025, concluded in the first quarter of 2026. The company expects the filter to reduce the mine's reliance on weather conditions for tailings management. The source cites the filter as an operational factor but does not quantify its direct effect on throughput.
Nexa expects Aripuanã's zinc production in 2026 to rise 49% from the 2025 reported level to 45,000-60,000 tons, driven by stable plant operations, the installation of the fourth filter and higher mining volumes. Output is expected to increase 24% in 2027 to 60,000-70,000 tons, and a further 7% in 2028 to 65,000-74,000 tons. At the consolidated level, Nexa expects zinc production for 2026 to increase 6% from the 2025 reported figure, and a further 8% in 2027 from the 2026 reported level.
The company cites higher production from Aripuanã, along with solid performances from the Atacocha and Cerro Lindo mines, as the drivers of this upside. Among peers, Hudbay Minerals Inc. expects zinc production of 16,000-21,000 tons in 2026, which the source describes as an increase of 5% at the midpoint. The same source also states that zinc production in 2026 is expected to be flat with 2025 levels.
The source does not reconcile these two statements, and they should be read with that caveat. Hudbay expects zinc production to reach 29,000-36,000 tons by 2028, a 76% increase from the 2026 midpoint, driven by higher production from the 1901 deposit. Teck Resources Limited reported zinc in concentrate production of 115.2 thousand tons in the third quarter of 2026.
According to the source, the decline reflected lower grades at Red Dog, in line with the mine plan. Nexa's stock has risen 113.6% over the past year, compared with a 15.9% return for the Zacks Mining - Miscellaneous industry, 12.7% for the Basic Materials sector and 9.3% for the S&P 500, according to Zacks. The stock trades at a forward 12-month earnings multiple of 3.63X, against an industry average of 14.32X.
The Zacks Consensus Estimate for Nexa's 2026 sales is $3.73 billion, a 24% year-over-year increase, and earnings of $2.69 per share, a 216% year-over-year increase. For 2027, the consensus implies a 1.4% sales increase and a 26.4% earnings increase. EPS estimates for 2026 and 2027 have moved up over the past 60 days.
Zacks currently assigns Nexa a Zacks Rank #1 (Strong Buy). Data scope note: the source does not include zinc price data from the LME or SHFE, LME warehouse inventory data, or market-wide zinc consumption or price forecasts. This article is therefore limited to company-level production, guidance, peer production figures and equity metrics.
Source: Zacks Investment Research, 'Can NEXA's Aripuana Mine Sustain Record Zinc Production?', via finance.yahoo.com.
Source: finance.yahoo.com